Monday, August 9, 2021

Phase 4b and 5b

 The second story framing and sheeting Britton got the idea to attach the sheeting and installation to the boards on the ground ( or second floor floor)so we wouldn't have to hang the sheeting from a ladder on the outside. It worked great, but made the walls super heavy. Call the crew again

 We had a CREW! 8 men and one of my  Young Women! They lifted and slid two heavy walls in to place. They were so awesome to help with our barn raising, 7 brothers for 7 brides was mentioned but no singing or dancing was done


Got both the longer side walls up and done and braced in no time. Thanks Britton for getting everything framed and covered.

The next day we built the outside wall and lifted with half the crew we did before. Thanks Hannah and Cooper for your help. true it hadthe biggest window whole and we left a lot of the corner pieces of the sheeting

The last wall Britton and the kids lifted, Didnt have the over hang piece and again left off a corner pieces of the sheeting. 

It is looking like a house! It is fun to watch all the foot traffic slow down walking past our house to see what we working on next, we will have to have an open house to show all the neighborhood our project.





No comments:

Post a Comment